      "Life-Cycle Assessment (LCA) of overhead versus underground

 primary power distribution in Southern California"

 

ABSTRACT                                                                                                                           

High power demand and expanding electricity infrastructure has spurred debate on the trade-offs between overhead (OH) and underground (UG) power distribution. Many regions in the US, EU, and Australia are considering revising the protocol for new power distribution installations and/or conversion of existing infrastructure to underground mode. Studies generally concur that underground distribution is much more costly to install, but may improve reliability and decrease maintenance costs. Recently, a few comparative environmental assessments of OH and UG cable production have been conducted. However, current literature lacks a full investigation of the life cycle environmental impacts of both distribution methods, including all infrastructure components. This project thus examines the difference between the potential environmental impacts of OH and UG primary power distribution systems.  It is based on a full LCA, which has been conducted using LCA software GaBi 4.3 and draws from a wide range of data sources. The analysis incorporates detailed information on the use phase, including installation, maintenance, and decommissioning of cable and associated infrastructural components. The study is also specific to Southern California Edison, one of the largest electric utility suppliers in the US. The results cover a wide range of environmental concerns, such as climate change, photochemical smog, acidification, and toxicity.

    DOWNLOADS (PDF)                                                                                                  ___ 

Project Poster (4,200 KB)

Full project report (550 KB)

Supplementary materials (1,500 KB)

Presentation (1,700 KB)